Neighborhoods we work in
4 sections of town- Athenia
- Allwood
- Botany Village
- Lakeview / Montclair Heights

Across the river from Garfield. We work in Clifton almost every week — bluestone steps, brick walkways, and the occasional fireplace surround.
Every town has its own quirks — building codes, soil, the architecture homeowners are working with. Here's what shapes our work in Clifton.
Clifton requires permits for retaining walls over 4 ft, structural masonry, and concrete work over 100 sq ft. The construction office on Main Avenue typically issues residential permits within 5–7 business days.
Six trades, one crew. Click any service to see scope, materials, and process for Clifton specifically.
Stone walls, retaining walls, chimney work, and structural repair
Masonry in CliftonFront stoops, garden steps, and entry treads in brick, bluestone, or granite — built level, plumb, and to code
Front Steps & Stoops in CliftonDriveways, walkways, slabs, and footings with proper subgrade compaction and clean control joints
Concrete Work in CliftonNew brick, repointing, chimney rebuilds, and façade restoration with mortar matched to the original building
Brick & Repointing in CliftonPatios, driveways, walkways, and pool decks built on a deep compacted base with polymeric joints
Paver Patios & Driveways in CliftonNatural stone veneer, fireplace surrounds, pillars, and accent walls — material picked at the yard with you
Natural Stone Veneer in CliftonThree services that show up most often when we're quoting in Clifton. Every job is built by our in-house crew — no subcontractors.
Front entry treads, garden steps, code-compliant risers.
Sand-set or mortar-set, in classic herringbone patterns.
Retaining or accent walls in fieldstone and bluestone.
A selection of recent projects built end-to-end by our in-house crew — stone, brick, pavers, concrete, and steps.
Things we've been asked most often by homeowners we've worked with in Clifton. Don't see your question? Give us a call.
Most front-step rebuilds run 3–5 days once the bluestone is on site. Lead time on the stone itself varies by yard — usually 1–2 weeks for stock thicknesses.
Yes. Botany Village's brick façades need careful tuckpointing — we match period mortar and joint profiles. The work may need historic-review approval depending on the building.
Yes. Concrete patios typically run 3–4 days for tear-out, prep, and pour. We use 4,000 PSI mix with proper expansion joints and a broom or exposed-aggregate finish.
Postwar Allwood ranches have concrete-block foundations with brick veneer — repairs need different lintel and weep-hole treatment than full-brick walls. We assess wall construction before quoting.
We work across 6 North Jersey counties — 33 towns in total. Here are the ones closest to Clifton.
We're about 12 minutes from your house. Site walks scheduled within 24 hours.